Crane installation
Crane installation in the hall for metal structure manufacturing.
After the 2014 site development (a new 1,500 m² building), production takes place in 8 halls on more than 5,000 m².
We have the necessary tools and machinery to do almost any metalwork at a high level (bending, laser cutting, pressing, milling, etc.).
Crane installation in the hall for metal structure manufacturing.
Installation of Baykal MGH-3120 plate shear.
Site development at Loschán Ltd.